9.2 material not in accordance with
in the case of a negative result of the test, the operator identifies the valves do not conform with the location in the appropriate bin marked with the red card, or by singolannente on each valve, the red card indicating that the valves are not usable.the operator shall complete the report of confonnita that runs for the signature of the responsible service quality guarantee, in accordance with the procedure sgq - 108.
Sedang diterjemahkan, harap tunggu..
